Close Menu
Car Candy Crush – Satisfy Your Sweet Tooth for Cars

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    New Porsche 911 996 and 997 High-Performance Lift Kit

    September 23, 2026

    Nissan reveals new affordable Pixo EV with up to 259 km of range

    September 23, 2026

    Superior Tire & Auto adds first new franchise location in 15 years

    September 23, 2026
    Facebook X (Twitter) Instagram
    Trending
    • New Porsche 911 996 and 997 High-Performance Lift Kit
    • Nissan reveals new affordable Pixo EV with up to 259 km of range
    • Superior Tire & Auto adds first new franchise location in 15 years
    • Honda Reportedly Planning Larger Three-Row SUV Above Pilot for 2032 : Automotive Addicts
    • The Most Powerful GTI Ever Built Loses To The Car It’s Supposed To Beat
    • A New 1,000-HP Aston Martin Convertible Could Be Just Around The Corner
    • BYD Denza launches Z9S electric sedan with range of up to 1,100 km
    • Control Resonant review: Nobody does it like Remedy
    Car Candy Crush – Satisfy Your Sweet Tooth for Cars
    Wednesday, September 23
    Facebook X (Twitter) Instagram
    • Home
    • Car Reviews
    • Auto News
    • Maintenance
    • Electric Vehicles
    • Car Tech
    • Classic Cars
    • Buying Guide
    • More
      • Parts & Upgrades
    Car Candy Crush – Satisfy Your Sweet Tooth for Cars
    Home»Electric Vehicles»DEWALT drilling robot seriously speeds up data center construction
    Electric Vehicles

    DEWALT drilling robot seriously speeds up data center construction

    kirklandc008@gmail.comBy kirklandc008@gmail.comJanuary 31, 2026No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    DEWALT drilling robot seriously speeds up data center construction
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The construction experts at DEWALT have launched what they’re calling the world’s first downward drilling, fleet-capable robot – a machine they say will enable more efficient concrete drilling to help accelerate data center construction.

    Developed in collaboration with August Robotics, DEWALT’s new, non-humanoid robot is completing its pilot stages after having completed 10 phases of data center construction with one unnamed “hyperscaler” and helping to significantly boost construction crews’ productivity during the trials.

    Throughout the ongoing program, the robot proved able to drill at speeds up to 10x faster than traditional methods, with outstanding overall results.

    Implementation of the robot has significantly expedited construction timelines with 80 weeks saved across 10 data center projects; radically decreased cost per hole; and delivered 99.97 percent accuracy of location and depth for over 90,000 holes.

    DEWALT

    “Our customers consistently emphasize that speed of construction is critical,” explains Bill Beck, President of Tools and Outdoor, Stanley Black & Decker. “The robotic drilling solution meets this need head-on through schedule acceleration, cost savings, near-perfect accuracy and enhanced jobsite safety. DEWALT’s relentless pursuit of innovation to drive productivity is redefining how the world builds.”

    Advertisement – scroll for more content

    DEWALT says its August-developed robotic drilling product will be available to its commercial customers mid-year, after a series of popular demonstration runs at this year’s World of Concrete trade show in Las Vegas last week. You can watch DEWALT’s robot driller get to work, below, then let us know what you think in the comments.

    DEWALT / August Robotics drilling robot

    SOURCE | IMAGES: DEWALT.

    If you’re considering going solar, it’s always a good idea to get quotes from a few installers. To make sure you find a trusted, reliable solar installer near you that offers competitive pricing, check out EnergySage, a free service that makes it easy for you to go solar. It has hundreds of pre-vetted solar installers competing for your business, ensuring you get high-quality solutions and save 20-30% compared to going it alone. Plus, it’s free to use, and you won’t get sales calls until you select an installer and share your phone number with them. 

    Your personalized solar quotes are easy to compare online and you’ll get access to unbiased Energy Advisors to help you every step of the way. Get started here.

    FTC: We use income earning auto affiliate links. More.

    center construction data DEWALT drilling robot speeds
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    kirklandc008@gmail.com
    • Website

    Related Posts

    Nissan reveals new affordable Pixo EV with up to 259 km of range

    September 23, 2026

    BYD Denza launches Z9S electric sedan with range of up to 1,100 km

    September 23, 2026

    Trucks gone wild! VinFast launches VF Wild EREV pickup

    September 23, 2026
    Leave A Reply Cancel Reply

    Our Picks
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    Don't Miss
    Car Reviews

    New Porsche 911 996 and 997 High-Performance Lift Kit

    By kirklandc008@gmail.comSeptember 23, 20260

    The Drive 🤝 your inbox. Every weekday The Daily Brief wraps up the biggest stories…

    Nissan reveals new affordable Pixo EV with up to 259 km of range

    September 23, 2026

    Superior Tire & Auto adds first new franchise location in 15 years

    September 23, 2026

    Honda Reportedly Planning Larger Three-Row SUV Above Pilot for 2032 : Automotive Addicts

    September 23, 2026

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    About Us

    Welcome to Car Candy Crush, where passion for cars meets creativity and style!
    We’re here to celebrate the beauty, power, and excitement of the automotive world — from classic rides to the latest high-tech supercars that make your heart race.

    Latest Post

    New Porsche 911 996 and 997 High-Performance Lift Kit

    September 23, 2026

    Nissan reveals new affordable Pixo EV with up to 259 km of range

    September 23, 2026

    Superior Tire & Auto adds first new franchise location in 15 years

    September 23, 2026
    Recent Posts
    • New Porsche 911 996 and 997 High-Performance Lift Kit
    • Nissan reveals new affordable Pixo EV with up to 259 km of range
    • Superior Tire & Auto adds first new franchise location in 15 years
    • Honda Reportedly Planning Larger Three-Row SUV Above Pilot for 2032 : Automotive Addicts
    • The Most Powerful GTI Ever Built Loses To The Car It’s Supposed To Beat
    Facebook X (Twitter) Instagram Pinterest
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms and Conditions
    • Disclaimer
    © 2026 CarCandyCrush. Designed by By Pro.

    Type above and press Enter to search. Press Esc to cancel.