Close Menu
Car Candy Crush – Satisfy Your Sweet Tooth for Cars

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Apple Has Released Security Updates For Mac

    August 6, 2026

    New Mercedes-AMG GT 53 4-Door Coupe has a 6-cylinder soundtrack but no engine

    August 6, 2026

    The Average APR For A Car Loan Is Higher Today Than During The Great Recession

    August 6, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Apple Has Released Security Updates For Mac
    • New Mercedes-AMG GT 53 4-Door Coupe has a 6-cylinder soundtrack but no engine
    • The Average APR For A Car Loan Is Higher Today Than During The Great Recession
    • Pony AI plans to deploy up to 1,000 Gen-4 autonomous heavy trucks in 2-3 years
    • Lamborghini’s New Super Revuelto Is Setting Records On The Wrong Track
    • An Obscure Physics Sim Is Reeling in Almost as Many Players as Forza Horizon 6 on Steam
    • Tesla, SpaceX confirm ‘Terafab’ chip fab site — $16.8B first phase
    • This Ford Dealer Knows How to Sell Trucks: Make Them Look Old
    Car Candy Crush – Satisfy Your Sweet Tooth for Cars
    Thursday, August 6
    Facebook X (Twitter) Instagram
    • Home
    • Car Reviews
    • Auto News
    • Maintenance
    • Electric Vehicles
    • Car Tech
    • Classic Cars
    • Buying Guide
    • More
      • Parts & Upgrades
    Car Candy Crush – Satisfy Your Sweet Tooth for Cars
    Home»Electric Vehicles»Tesla, SpaceX confirm ‘Terafab’ chip fab site — $16.8B first phase
    Electric Vehicles

    Tesla, SpaceX confirm ‘Terafab’ chip fab site — $16.8B first phase

    kirklandc008@gmail.comBy kirklandc008@gmail.comAugust 6, 2026No Comments5 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Tesla, SpaceX confirm ‘Terafab’ chip fab site — $16.8B first phase
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Tesla and SpaceX have confirmed where they’ll build Terafab, the semiconductor megafactory Elon Musk first teased in March. It’s going to Grimes County, Texas, about an hour northwest of Houston.

    The companies put the initial phase at roughly $16.8 billion and said the finished site will span more than 100 million square feet, which they’re calling the largest chip manufacturing facility on the planet.

    SpaceX laid out the plan in an update on its site Thursday, and Tesla echoed it on X. “Both Tesla & SpaceX will need far more chips than current & future global production can supply,” Tesla wrote, pointing to a goal of “producing over 1 terawatt of compute per year.”

    Terafab will be built in Grimes County, Texas

    In April, we broke ground on our research fab on the North Campus of Giga Texas – the precursor to Terafab.

    Both Tesla & SpaceX will need far more chips than current & future global production can supply.

    This is why we’re building… pic.twitter.com/je4jKXuQrY

    — Tesla (@Tesla) August 6, 2026

    The pitch is vertical integration at a scale nobody has attempted. SpaceX says Terafab will combine logic, memory, packaging, and testing under one roof, producing chips for Tesla’s Optimus robots and Cybercabs and for the “space-based data centers” SpaceX wants to launch. The first phase is $16.8 billion from the two companies, with “future expansion phases bringing total investment much higher.” At least 3,000 people would work there, most of them local hires.

    Advertisement – scroll for more content

    The site has a backstory. Terafab will sit on the Gibbons Creek Reservoir, which used to cool a coal-fired power plant that shut down in 2018. SpaceX says it’ll pull water from the reservoir rather than local groundwater, a nod to a Grimes County community that’s already uneasy about water use and the data centers spreading across Texas.

    The price tag keeps moving

    That $16.8 billion figure is not the number Musk led with. When Tesla and SpaceX first announced Terafab in March, the headline number was $25 billion. Now it’s a $16.8 billion “initial phase,” with the rest left vague.

    And in May, SpaceX’s own IPO paperwork undercut the pitch. The company’s S-1 filing described Terafab as only a “general framework” with no binding commitments, no finalized IP split, and no obligation for either side to keep participating. A month before that, we reported that Tesla wasn’t really going to build the fab itself, with Intel lined up to handle the actual manufacturing.

    So the confident tweet naming a county sits on top of a paper trail that says a lot of this is still undecided.

    Tesla already has its chips coming from Samsung and TSMC

    None of this is about Tesla’s near-term supply, which is already contracted out. Samsung’s Taylor, Texas fab is in production on Tesla’s AI5 chip, and last year Tesla signed a $16.5 billion deal with Samsung to build its next-generation AI6 chip. TSMC covers the rest.

    That makes Terafab a much longer bet, tied to Musk’s claim that his companies will eventually need more compute than the whole semiconductor industry can produce. It’s the same “1 terawatt of compute per year” math he laid out when SpaceX absorbed xAI in February and started pitching orbital data centers.

    The scale claims are hard to square with anything that exists. 100 million square feet is more than ten times the floor space of TSMC’s biggest gigafabs. TSMC is spending roughly $165 billion to build six fabs in Arizona, and those are a fraction of Terafab’s stated footprint. No fab on Earth is built to output “a terawatt of compute” a year, because that number doesn’t come from the chip industry. It comes from Musk’s space ambitions.

    Electrek’s Take

    Terafab is more real today than it was in March. There’s a county, a site, permits moving, and SpaceX reps sitting down with residents. That’s more than a slide in a keynote.

    But the gap between the tweet and the fine print is still wide. Tesla and SpaceX are calling this “the largest chip manufacturing facility ever” before pouring a foundation, while the same SpaceX told IPO investors three months ago that Terafab was a “general framework” with no binding commitments. Both of those can’t be fully true.

    The number that matters for Tesla shareholders is how much of that $16.8 billion, and the “much higher” that follows, lands on Tesla’s balance sheet. Tesla already committed $16.5 billion to Samsung for chips it can build today, while its car business has stopped growing. Pouring billions more into a terawatt of compute for robots and orbital data centers describes a very different company than the one most Tesla investors originally bought into.

    However, it fulfills Musk’s long-stated argument that “Tesla is not an automaker anymore.”

    As data centers put mounting pressure on the grid and electricity rates keep climbing, home solar and batteries are becoming basic infrastructure rather than a luxury. With electricity rates up almost 10% last year and expected to keep climbing, going solar is one of the best ways to protect yourself against rising costs. And with lease and PPA options, you can do it with zero upfront cost and start saving immediately. If you want to find the best deal, check out EnergySage. It’s a free service with hundreds of pre-vetted installers competing for your business, so you save 20 to 30% compared to going it alone. No sales calls until you pick an installer. Get your free quotes here.

    FTC: We use income earning auto affiliate links. More.

    16.8B Chip confirm fab phase site SpaceX Terafab Tesla
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    kirklandc008@gmail.com
    • Website

    Related Posts

    Pony AI plans to deploy up to 1,000 Gen-4 autonomous heavy trucks in 2-3 years

    August 6, 2026

    Smart launches new-generation #1 in China, starting at about $22,100

    August 6, 2026

    Ford’s affordable EV pickup is named Fathom, priced from $28,350

    August 6, 2026
    Leave A Reply Cancel Reply

    Our Picks
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    Don't Miss
    Car Tech

    Apple Has Released Security Updates For Mac

    By kirklandc008@gmail.comAugust 6, 20260

    Tahoe, Sequoia and Sonoma operating systems have been patched to address a Screen Sharing vulnerability.…

    New Mercedes-AMG GT 53 4-Door Coupe has a 6-cylinder soundtrack but no engine

    August 6, 2026

    The Average APR For A Car Loan Is Higher Today Than During The Great Recession

    August 6, 2026

    Pony AI plans to deploy up to 1,000 Gen-4 autonomous heavy trucks in 2-3 years

    August 6, 2026

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    About Us

    Welcome to Car Candy Crush, where passion for cars meets creativity and style!
    We’re here to celebrate the beauty, power, and excitement of the automotive world — from classic rides to the latest high-tech supercars that make your heart race.

    Latest Post

    Apple Has Released Security Updates For Mac

    August 6, 2026

    New Mercedes-AMG GT 53 4-Door Coupe has a 6-cylinder soundtrack but no engine

    August 6, 2026

    The Average APR For A Car Loan Is Higher Today Than During The Great Recession

    August 6, 2026
    Recent Posts
    • Apple Has Released Security Updates For Mac
    • New Mercedes-AMG GT 53 4-Door Coupe has a 6-cylinder soundtrack but no engine
    • The Average APR For A Car Loan Is Higher Today Than During The Great Recession
    • Pony AI plans to deploy up to 1,000 Gen-4 autonomous heavy trucks in 2-3 years
    • Lamborghini’s New Super Revuelto Is Setting Records On The Wrong Track
    Facebook X (Twitter) Instagram Pinterest
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms and Conditions
    • Disclaimer
    © 2026 CarCandyCrush. Designed by By Pro.

    Type above and press Enter to search. Press Esc to cancel.