Close Menu
Car Candy Crush – Satisfy Your Sweet Tooth for Cars

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Mercedes-AMG Is Officially Building An Off-Road Convertible

    July 25, 2026

    Why Waste $100,000+ On A Mercedes GLS When This Lexus Does Everything Better For Less?

    July 25, 2026

    ‘745 Miles Of Range With The Solid-State Pack’

    July 25, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Mercedes-AMG Is Officially Building An Off-Road Convertible
    • Why Waste $100,000+ On A Mercedes GLS When This Lexus Does Everything Better For Less?
    • ‘745 Miles Of Range With The Solid-State Pack’
    • Xpeng recalls X9 electric MPVs in China after apology over air spring failures
    • A 1.2 GW solar farm is rising at a Texas coal site – but coal is staying
    • Galaxy Watch 9 vs. Watch Series 11: Has Apple finally met its smartwatch match?
    • 15 Luxury Cars That Are Notoriously Reliable Yet Crazy Cheap
    • Why a VIN Search Should Be Your First Step Before Buying a Used Car : Automotive Addicts
    Car Candy Crush – Satisfy Your Sweet Tooth for Cars
    Saturday, July 25
    Facebook X (Twitter) Instagram
    • Home
    • Car Reviews
    • Auto News
    • Maintenance
    • Electric Vehicles
    • Car Tech
    • Classic Cars
    • Buying Guide
    • More
      • Parts & Upgrades
    Car Candy Crush – Satisfy Your Sweet Tooth for Cars
    Home»Electric Vehicles»A 1.2 GW solar farm is rising at a Texas coal site – but coal is staying
    Electric Vehicles

    A 1.2 GW solar farm is rising at a Texas coal site – but coal is staying

    kirklandc008@gmail.comBy kirklandc008@gmail.comJuly 24, 2026No Comments4 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    A 1.2 GW solar farm is rising at a Texas coal site – but coal is staying
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Photo: Panamint

    One of North America’s biggest coal-site solar projects is now under construction in Texas – but the coal plant next door isn’t going anywhere. Here’s why.

    Panamint Capital has broken ground on Big Rooter Power, a $1.7 billion solar project at its Twin Oaks power station in Robertson County, roughly halfway between Dallas and Houston. At 1.2 GWdc, Panamint says it will be the largest solar farm built at an existing coal mining site in North America.

    But this isn’t a coal-to-solar conversion. Twin Oaks includes a 310 MW lignite-fired power plant near Bremond, and no plans have been announced to retire it. The company still lists Twin Oaks as an operating coal power station.

    Texas solar + coal = Big Rooter

    Big Rooter will be built in two phases. Construction has started on the 491 MWdc Big Rooter West, which is expected to come online in August 2028.

    Advertisement – scroll for more content

    The 658 MWdc Big Rooter East is scheduled to break ground in December 2026 and come online in August 2029. Together, the two phases are expected to create more than 800 construction jobs.

    Panamint estimates that Big Rooter West will contribute more than $66 million to the local economy over its lifetime, with an emphasis on hiring local workers and using regional vendors.

    Once Big Rooter is complete, the 10,000-acre Twin Oaks complex will have around 1.5 GW of coal and solar generation. Panamint is also developing more than 20 miles of new 345 kV transmission, 1.6 GWh of battery storage, and 790 MW of data center capacity at the site.

    “Big Rooter Power represents our vision for getting more out of America’s energy infrastructure and ensuring America’s energy dominance,” said Panamint CEO Apolka Totth.

    2 million US-made solar panels

    SOLV Energy will handle engineering, procurement, and construction, including the solar arrays, substation, and transmission infrastructure.

    First Solar will supply around 2 million solar panels manufactured at its factories in Ohio, Louisiana, and Alabama. Nextpower will provide its NX Horizon tracking systems, which tilt the panels throughout the day to follow the sun. The project will also use more than 34,000 tons of US-made steel.

    Panamint says it has signed a long-term power purchase agreement with a “single investment-grade offtaker,” but it hasn’t named the buyer. The contract is expected to run into the 2050s.

    Big Rooter is a huge solar build, but Panamint isn’t replacing the site’s coal generation with renewables. It’s packing solar, coal, battery storage, transmission, and data centers onto the same property as electricity demand in Texas continues to climb.

    According to JLL‘s data center outlook, Texas is one of the fastest-growing US data center regions in the US, with growth concentrated around Dallas-Fort Worth.

    Power supply on the ERCOT grid is the main growth constraint for the data center industry in “all of the above” Texas.

    Read more: Texas adds another huge solar farm as ERCOT grid demand soars

    If you’re looking to replace your old HVAC equipment, it’s always a good idea to get quotes from a few installers. To make sure you’re finding a trusted, reliable HVAC installer near you that offers competitive pricing on heat pumps, check out EnergySage. EnergySage is a free service that makes it easy for you to get a heat pump. They have pre-vetted heat pump installers competing for your business, ensuring you get high quality solutions. Plus, it’s free to use!

    Your personalized heat pump quotes are easy to compare online and you’ll get access to unbiased Energy Advisors to help you every step of the way. Get started here. – *ad

    FTC: We use income earning auto affiliate links. More.

    coal farm rising site Solar Staying Texas
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    kirklandc008@gmail.com
    • Website

    Related Posts

    Xpeng recalls X9 electric MPVs in China after apology over air spring failures

    July 25, 2026

    Voyah begins pre-sales of Passion S to take on Xiaomi’s popular YU7

    July 24, 2026

    Audi’s most affordable EV revealed with 400 miles of range [Video]

    July 24, 2026
    Leave A Reply Cancel Reply

    Our Picks
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    Don't Miss
    Auto News

    Mercedes-AMG Is Officially Building An Off-Road Convertible

    By kirklandc008@gmail.comJuly 25, 20260

    Back in September, Mercedes-Benz announced the return of the G-Class Cabriolet with a teaser showing…

    Why Waste $100,000+ On A Mercedes GLS When This Lexus Does Everything Better For Less?

    July 25, 2026

    ‘745 Miles Of Range With The Solid-State Pack’

    July 25, 2026

    Xpeng recalls X9 electric MPVs in China after apology over air spring failures

    July 25, 2026

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    About Us

    Welcome to Car Candy Crush, where passion for cars meets creativity and style!
    We’re here to celebrate the beauty, power, and excitement of the automotive world — from classic rides to the latest high-tech supercars that make your heart race.

    Latest Post

    Mercedes-AMG Is Officially Building An Off-Road Convertible

    July 25, 2026

    Why Waste $100,000+ On A Mercedes GLS When This Lexus Does Everything Better For Less?

    July 25, 2026

    ‘745 Miles Of Range With The Solid-State Pack’

    July 25, 2026
    Recent Posts
    • Mercedes-AMG Is Officially Building An Off-Road Convertible
    • Why Waste $100,000+ On A Mercedes GLS When This Lexus Does Everything Better For Less?
    • ‘745 Miles Of Range With The Solid-State Pack’
    • Xpeng recalls X9 electric MPVs in China after apology over air spring failures
    • A 1.2 GW solar farm is rising at a Texas coal site – but coal is staying
    Facebook X (Twitter) Instagram Pinterest
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms and Conditions
    • Disclaimer
    © 2026 CarCandyCrush. Designed by By Pro.

    Type above and press Enter to search. Press Esc to cancel.